Skip to content
First Lutheran Church 01

First Lutheran Church

Sauk Centre, MN

Water damage destroyed both levels of their education wing, leading to a remodel. The project consisted of reconfiguring the current space to be larger, adding a kitchenette, moving a restroom, revising the nursery to add a mother’s room, refocusing the lower level for children/youth ministry, adding a glass wall to separate overflow seating, and installing a new exterior sign.A new Wi-Fi HVAC thermostat and security system was also installed. The sanctuary was turned 90 degrees to allow for unobstructed sight lines. New flooring and paint makes for amore welcoming entrance throughout the gathering space.

Details:

  • Complete Renovation of Education Wing
  • New Serving Kitchen
  • New Mother’s Room
  • Sanctuary Rotation of 90 Degrees

Delivery Method: Construction Management

  • New Glass Separation Wall
  • New Wi-Fi HVAC Thermostat
  • New Flooring, Paint, and Exterior Sign